Ce site utilise des témoins de navigation afin de vous offrir une expérience optimale.
Number* | Standard Title | Initial Enforcement Date / Decision | Inactive date / Decision | Notes |
---|---|---|---|---|
CIP-003-8
|
Cyber Security — Security Management Controls | October 1, 2021
D-2020-118 |
July 1, 2027
D-2024-043 |
|
CIP-004-6 | Cyber Security — Personnel & Training |
January 1, 2018
|
January 1, 2025
D-2022-150 |
|
CIP-011-2 | Cyber Security — Information Protection |
January 1, 2018
|
January 1, 2025
D-2022-150 |
|
FAC-003-4
|
Transmission Vegetation Management
|
April 1, 2021
|
October 1, 2026
|
|
FAC-011-3
|
System Operating Limits Methodology for the Operations Horizon
|
October 1, 2021
|
October 1, 2026
|
|
FAC-014-2
|
Establish and Communicate System Operating Limits
|
January 1, 2016
|
October 1, 2026
|
|
IRO-008-2
|
Reliability Coordinator Operational Analyses and Real‐time Assessments
|
July 1, 2017
|
October 1, 2026
|
|
IRO-010-4
|
Reliability Coordinator Data Specification and Collection
|
October 1, 2024
|
April 1, 2026
|
|
PRC-002-2
|
Disturbance Monitoring and Reporting Requirements
|
January 1, 2018
|
October 1, 2026
|
|
PRC-023-4
|
Transmission Relay Loadability
|
January 1, 2021
|
October 1, 2026
|
|
PRC-024-2 | Generator Frequency and Voltage Protective Relay Settings |
April 1, 2021
|
July 1, 2025
|
|
PRC-026-1
|
Relay Performance During Stable Power Swings
|
R1 - January 1, 2018
R2 to R4 for the non BPS RTP facilities connected to the RTP – April 1, 2021 D-2017-076D-2020-036R |
October 1, 2026
|
|
TOP-001-5
|
Transmission Operations
|
July 1, 2023
|
October 1, 2026
|
|
TOP-003-5
|
Operational Reliability Data
|
October 1, 2024
|
April 1, 2026
|
|
* In the case of Reliability Standards (Requirements) to be withdrawn at a future date, the standard number links to the text. If the link is broken, please inform the Documentation centre of the Régie.
© Gouvernement du Québec, 2024
Blanko