Document | Standard Number | Standard Title | Effective Date of the form |
---|---|---|---|
BAL-001-2 | Real Power Balancing Control Performance |
February 9, 2022 |
|
QRSAW_BAL-002-3_v2EN
|
BAL-002-3 | Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event | February 9, 2022 |
QRSAW_BAL-003-2_v1EN
|
BAL-003-2 | Frequency Response and Frequency Bias Setting | December 1, 2021 |
QRSAW_BAL-005-1_v2EN
|
BAL-005-1 | Balancing Authority Control | February 9, 2022 |
QRSAW_CIP-002-5.1a_v3EN
|
CIP-002-5.1a | Cyber Security – BES Cyber System Categorization | February 9, 2022 |
QRSAW_CIP-003-8_v2EN
|
CIP-003-8 | Cyber Security – Security Management Controls | February 9, 2022 |
QRSAW_CIP-004-6_v2EN
|
CIP-004-6 | Cyber Security – Personnel & Training | February 9, 2022 |
QRSAW_CIP-005-7_v1EN
|
CIP-005-7 | Cyber Security – Electronic Security Perimeter(s) | November 15, 2023
|
QRSAW_CIP-006-6_v2EN
|
CIP-006-6 | Cyber Security – Physical Security of BES Cyber Systems | February 9, 2022 |
QRSAW_CIP-007-6_v2EN
|
CIP-007-6 | Cyber Security – System Security Management | February 9, 2022 |
QRSAW_CIP-008-6_v1EN
|
CIP-008-6 | Cyber Security – Incident Reporting and Response Planning | October 6, 2022 |
QRSAW_CIP-009-6_v2EN
|
CIP-009-6 | Cyber Security – Recovery Plans for BES Cyber Systems | February 9, 2022 |
QRSAW_CIP-010-4_v1EN
|
CIP-010-4 | Cyber Security – Configuration Change Management and Vulnerability Assessments | December 13, 2023 |
QRSAW_CIP-011-2_v2EN
|
CIP-011-2 | Cyber Security – Information Protection | June 15, 2022 |
QRSAW_CIP-012-1_v1EN
|
CIP-012-1
|
Cyber Security – Communications between Control Centers
|
June 26, 2024 |
QRSAW_CIP-013-2_v1EN
|
CIP-013-2
|
Cyber Security – Supply Chain Risk Management | December 13, 2023 |
QRSAW_CIP-014-3_v1EN
|
CIP-014-3 | Physical Security
|
September 27, 2023 |
QRSAW_COM-001-3_v2EN
|
COM-001-3 | Communications | June 15, 2022 |
QRSAW_COM-002-4_V2EN
|
COM-002-4 | Operating Personnel Communications Protocols | June 15, 2022 |
QRSAW_EOP-004-4_v2EN
|
EOP-004-4 | Event Reporting | June 15, 2022 |
QRSAW_EOP-005-3_v2EN
|
EOP-005-3 | System Restoration from Blackstart Resources | June 15, 2022 |
QRSAW_EOP-006-3_v2EN
|
EOP-006-3 | System Restoration Coordination | June 15, 2022 |
QRSAW_EOP-008-2_v2EN
|
EOP-008-2 | Loss of Control Center Functionality | June 15, 2022 |
QRSAW_EOP-010-1_v3EN
|
EOP-010-1 | Geomagnetic Disturbance Operations | June 15, 2022 |
QRSAW_EOP-011-2_v1EN
|
EOP-011-2 | Emergency Preparedness and Operations | November 27, 2024 |
QRSAW_FAC-001-4_v1EN
|
FAC-001-4 | Facility Interconnection Requirements | October 23, 2024 |
QRSAW_FAC-002-4_v1EN
|
FAC-002-4 | Facility Interconnection Studies | October 23, 2024 |
QRSAW_FAC-003-4_v2EN
|
FAC-003-4 | Transmission Vegetation Management | June 15, 2022 |
QRSAW_FAC-008-5_v1EN
|
FAC-008-5 | Facility Ratings | May 11, 2022 |
QRSAW_FAC-011-3 v1EN
|
FAC-011-3 | System Operating Limits Methodology for the Operations Horizon | October 1, 2021 |
QRSAW_FAC-014-2_v2EN
|
FAC-014-2 | Establish and Communicate System Operating Limits | June 15, 2022 |
QRSAW INT-006-5 v1EN
|
INT-006-5 | Evaluation of Interchange Transactions | October 1, 2021 |
QRSAW INT-009-3 v1EN
|
INT-009-3 | Implementation of Interchange | October 1, 2021 |
QRSAW IRO-001-4 v2EN
|
IRO-001-4 | Reliability Coordination – Responsibilities | July 27, 2022 |
QRSAW_IRO-002-7_v1EN
|
IRO-002-7 | Reliability Coordination – Monitoring and Analysis | May 11, 2022 |
QRSAW IRO-006-5 v2EN
|
IRO-006-5 | Reliability Coordination – Transmission Loading Relief (TLR) | July 27, 2022 |
QRSAW IRO-008-2 v2EN
|
IRO-008-2 | Reliability Coordinator Operational Analyses and Real-time Assessments | July 27, 2022 |
QRSAW IRO-009-2 v2EN
|
IRO-009-2 | Reliability Coordinator Actions to Operate Within IROLs | July 27, 2022 |
QRSAW IRO-010-4 v1EN
|
IRO-010-4 | Reliability Coordinator Data Specification and Collection | November 27, 2024 |
QRSAW IRO-014-3 v2EN
|
IRO-014-3 | Coordination Among Reliability Coordinators | July 27, 2022 |
QRSAW IRO-017-1 v2EN
|
IRO-017-1 | Outage coordination | July 27, 2022 |
QRSAW_IRO-018-1(i)_v1EN
|
IRO-018-1(i) | Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities | February 9, 2022 |
QRSAW MOD-025-2 v2EN
|
MOD-025-2 | Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability | July 27, 2022 |
QRSAW MOD-026-1 v2EN
|
MOD-026-1 | Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions | July 27, 2022 |
QRSAW MOD-027-1 v2EN
|
MOD-027-1 | Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions | July 27, 2022 |
QRSAW_MOD-031-3_v1EN
|
MOD-031-3 | Demand and Energy Data | October 6, 2022 |
QRSAW MOD-032-1 v2EN
|
MOD-032-1 | Data for Power System Modeling and Analysis | July 27, 2022 |
QRSAW_MOD-033-2_v1EN
|
MOD-033-2 | Steady-State and Dynamic System Model Validation | October 6, 2022 |
QRSAW_PER-003-2_v1EN
|
PER-003-2 | Operating Personnel Credentials Standard | February 9, 2022 |
QRSAW PER-005-2 v2EN
|
PER-005-2 | Operations Personnel Training | July 27, 2022 |
QRSAW PER-006-1 v1EN
|
PER-006-1
|
Specific Training for Personnel | September 27, 2023
|
QRSAW_PRC-002-2_v2EN
|
PRC-002-2 | Disturbance Monitoring and Reporting Requirements | September 7, 2022 |
QRSAW PRC-004-6 v1EN
|
PRC-004-6 | Protection System Misoperation Identification and Correction | October 1, 2021 |
QRSAW_PRC-005-6_v2EN
|
PRC-005-6 | Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance | September 7, 2022 |
QRSAW_PRC-006-5_v1EN
|
PRC-006-5 | Automatic Underfrequency Load Shedding | January 11, 2023 |
QRSAW_PRC-006-NPCC-2_v2EN
|
PRC-006-NPCC-2 | Automatic Underfrequency Load Shedding | September 7, 2022 |
QRSAW_PRC-010-2_v2EN
|
PRC-010-2 | Undervoltage Load Shedding | September 7, 2022 |
QRSAW_PRC-012-2_v2EN
|
PRC-012-2 | Remedial Action Schemes | September 7, 2022 |
QRSAW_PRC-019-2_v2EN
|
PRC-019-2 | Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection | September 7, 2022 |
QRSAW_PRC-023-4_v2EN
|
PRC-023-4 | Transmission Relay Loadability | September 7, 2022 |
QRSAW_PRC-024-2_v2EN
|
PRC-024-2 | Generator Frequency and Voltage Protective Relay Settings | July 27, 2022 |
QRSAW_PRC-025-2_v1EN
|
PRC-025-2 | Generator Relay Loadability | January 11, 2023 |
QRSAW_PRC-026-1_v3EN
|
PRC-026-1 | Relay Performance During Stable Power Swings | September 7, 2022 |
QRSAW_PRC-027-1_v1EN
|
PRC-027-1
|
Coordination of Protection Systems for Performance During Faults
|
September 18, 2024
|
QRSAW_TOP-001-5_v1EN
|
TOP-001-5
|
Transmission Operations | December 13, 2023 |
QRSAW_TOP-002-4_v2EN
|
TOP-002-4 | Operations Planning | September 7, 2022 |
QRSAW_TOP-003-5_v1EN
|
TOP-003-5 | Operational Reliability Data
|
November 27, 2024
|
QRSAW_TOP-010-1(i)_v1EN
|
TOP-010-1(i) | Real-time Reliability Monitoring and Analysis Capabilities | February 9, 2022 |
QRSAW_TPL-001-4_v2EN
|
TPL-001-4 | Transmission System Planning Performance Requirements | September 7, 2022 |
QRSAW_TPL-007-4_v1EN
|
TPL-007-4 | Transmission System Planned Performance for Geomagnetic Disturbance Events | December 13, 2023 |
QRSAW VAR-001-4.2 v2EN
|
VAR-001-4.2 | Voltage and Reactive Control | July 27, 2022 |
QRSAW_VAR-002-4.1_v2EN
|
VAR-002-4.1 | Generator Operation for Maintaining Network Voltage Schedules
|
July 27, 2022 |
Notes :
1 – Northeast Power Coordinating Council (NPCC) is responsible of the development of the Québec Reliability Standard Audit Worksheets, «QRSAW» and the Régie de l’énergie (the Régie), for publishing them. You may send all your comments and suggestions to the Régie which will either address them or transfer them to NPCC. Please, use the following email address: secretariat-PSCAQ@regie-energie.qc.ca.
© Gouvernement du Québec, 2024
Blanko