Québec Reliability Standard Audit Worksheets (QRSAW) (1)


Document (2) Standard Number Standard Title Effective Date of the form

QRSAW BAL-001-2 v2EN

BAL-001-2 Real Power Balancing Control Performance

February 9, 2022

QRSAW_BAL-002-3_v2EN
BAL-002-3 Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Event February 9, 2022
QRSAW_BAL-003-2_v1EN
BAL-003-2 Frequency Response and Frequency Bias Setting December 1, 2021
QRSAW_BAL-005-1_v2EN
BAL-005-1 Balancing Authority Control February 9, 2022
QRSAW_CIP-002-5.1a_v3EN
CIP-002-5.1a Cyber Security – BES Cyber System Categorization February 9, 2022
QRSAW_CIP-003-8_v2EN
CIP-003-8 Cyber Security – Security Management Controls February 9, 2022
QRSAW_CIP-004-6_v2EN
CIP-004-6 Cyber Security – Personnel & Training February 9, 2022
QRSAW_CIP-005-7_v1EN
CIP-005-7 Cyber Security – Electronic Security Perimeter(s) November 15, 2023
QRSAW_CIP-006-6_v2EN
CIP-006-6 Cyber Security – Physical Security of BES Cyber Systems February 9, 2022
QRSAW_CIP-007-6_v2EN
CIP-007-6 Cyber Security – System Security Management February 9, 2022
QRSAW_CIP-008-6_v1EN
CIP-008-6 Cyber Security – Incident Reporting and Response Planning October 6, 2022
QRSAW_CIP-009-6_v2EN
CIP-009-6 Cyber Security – Recovery Plans for BES Cyber Systems February 9, 2022
QRSAW_CIP-010-4_v1EN
CIP-010-4 Cyber Security – Configuration Change Management and Vulnerability Assessments December 13, 2023
QRSAW_CIP-011-2_v2EN
CIP-011-2 Cyber Security – Information Protection June 15, 2022
QRSAW_CIP-013-2_v1EN
CIP-013-2
Cyber Security – Supply Chain Risk Management December 13, 2023
QRSAW_CIP-014-3_v1EN
CIP-014-3 Physical Security
September 27, 2023
QRSAW_COM-001-3_v2EN
COM-001-3 Communications June 15, 2022
QRSAW_COM-002-4_V2EN
COM-002-4 Operating Personnel Communications Protocols June 15, 2022
QRSAW_EOP-004-4_v2EN
EOP-004-4 Event Reporting June 15, 2022
QRSAW_EOP-005-3_v2EN
EOP-005-3 System Restoration from Blackstart Resources June 15, 2022
QRSAW_EOP-006-3_v2EN
EOP-006-3 System Restoration Coordination June 15, 2022
QRSAW_EOP-008-2_v2EN
EOP-008-2 Loss of Control Center Functionality June 15, 2022
QRSAW_EOP-010-1_v3EN
EOP-010-1 Geomagnetic Disturbance Operations June 15, 2022
QRSAW_EOP-011-1_v2EN
EOP-011-1 Emergency Operations June 15, 2022
QRSAW_FAC-001-3_v2EN
FAC-001-3 Facility Interconnection Requirements March 30, 2022
QRSAW_FAC-002-3_v1EN
FAC-002-3 Facility Interconnection Studies October 6, 2022
QRSAW_FAC-003-4_v2EN
FAC-003-4 Transmission Vegetation Management June 15, 2022
QRSAW_FAC-008-5_v1EN
FAC-008-5 Facility Ratings May 11, 2022
QRSAW_FAC-011-3 v1EN
FAC-011-3 System Operating Limits Methodology for the Operations Horizon October 1, 2021
QRSAW_FAC-014-2_v2EN
FAC-014-2 Establish and Communicate System Operating Limits June 15, 2022
QRSAW INT-006-5 v1EN
INT-006-5 Evaluation of Interchange Transactions October 1, 2021
QRSAW INT-009-3 v1EN
INT-009-3 Implementation of Interchange October 1, 2021
QRSAW IRO-001-4 v2EN
IRO-001-4 Reliability Coordination – Responsibilities July 27, 2022
QRSAW_IRO-002-7_v1EN
IRO-002-7 Reliability Coordination – Monitoring and Analysis May 11, 2022
QRSAW IRO-005-3.1a v3EN
IRO-005-3.1a Reliability Coordination – Current Day Operations July 27, 2022
QRSAW IRO-006-5 v2EN
IRO-006-5 Reliability Coordination – Transmission Loading Relief (TLR) July 27, 2022
QRSAW IRO-008-2 v2EN
IRO-008-2 Reliability Coordinator Operational Analyses and Real-time Assessments July 27, 2022
QRSAW IRO-009-2 v2EN
IRO-009-2 Reliability Coordinator Actions to Operate Within IROLs July 27, 2022
QRSAW IRO-010-3 v1EN
IRO-010-3 Reliability Coordinator Data Specification and Collection October 6, 2022
QRSAW IRO-014-3 v2EN
IRO-014-3 Coordination Among Reliability Coordinators July 27, 2022
QRSAW IRO-017-1 v2EN
IRO-017-1 Outage coordination July 27, 2022
QRSAW_IRO-018-1(i)_v1EN
IRO-018-1(i) Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities February 9, 2022
QRSAW MOD-025-2 v2EN
MOD-025-2 Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability July 27, 2022
QRSAW MOD-026-1 v2EN
MOD-026-1 Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions July 27, 2022
QRSAW MOD-027-1 v2EN
MOD-027-1 Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions July 27, 2022
QRSAW_MOD-031-3_v1EN
MOD-031-3 Demand and Energy Data October 6, 2022
QRSAW MOD-032-1 v2EN
MOD-032-1 Data for Power System Modeling and Analysis July 27, 2022
QRSAW_MOD-033-2_v1EN
MOD-033-2 Steady-State and Dynamic System Model Validation October 6, 2022
QRSAW_PER-003-2_v1EN
PER-003-2 Operating Personnel Credentials Standard February 9, 2022
QRSAW PER-005-2 v2EN
PER-005-2 Operations Personnel Training July 27, 2022
QRSAW PER-006-1 v1EN
PER-006-1
Specific Training for Personnel September 27, 2023
QRSAW_PRC-001-1.1(ii)_v3EN
PRC-001-1.1(ii) System Protection Coordination September 27, 2023
QRSAW_PRC-002-2_v2EN
PRC-002-2 Disturbance Monitoring and Reporting Requirements September 7, 2022
QRSAW PRC-004-6 v1EN
PRC-004-6 Protection System Misoperation Identification and Correction October 1, 2021
QRSAW_PRC-005-6_v2EN
PRC-005-6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance September 7, 2022
QRSAW_PRC-006-5_v1EN
PRC-006-5 Automatic Underfrequency Load Shedding January 11, 2023
QRSAW_PRC-006-NPCC-2_v2EN
PRC-006-NPCC-2 Automatic Underfrequency Load Shedding September 7, 2022
QRSAW_PRC-010-2_v2EN
PRC-010-2 Undervoltage Load Shedding September 7, 2022
QRSAW_PRC-012-2_v2EN
PRC-012-2 Remedial Action Schemes September 7, 2022
QRSAW_PRC-019-2_v2EN
PRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection September 7, 2022
QRSAW_PRC-023-4_v2EN
PRC-023-4 Transmission Relay Loadability September 7, 2022
QRSAW_PRC-024-2_v2EN
PRC-024-2 Generator Frequency and Voltage Protective Relay Settings July 27, 2022
QRSAW_PRC-025-2_v1EN
PRC-025-2 Generator Relay Loadability January 11, 2023
QRSAW_PRC-026-1_v3EN
PRC-026-1 Relay Performance During Stable Power Swings September 7, 2022
QRSAW_TOP-001-5_v1EN
TOP-001-5
Transmission Operations December 13, 2023
QRSAW_TOP-002-2.1b_v3EN
TOP-002-2.1 Normal Operations Planning September 7, 2022
QRSAW_TOP-002-4_v2EN
TOP-002-4 Operations Planning September 7, 2022
QRSAW_TOP-003-4_v1EN
TOP-003-4 Operational Reliability Data October 6, 2022
QRSAW_TOP-010-1(i)_v1EN
TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities February 9, 2022
QRSAW_TPL-001-4_v2EN
TPL-001-4 Transmission System Planning Performance Requirements September 7, 2022
QRSAW_TPL-007-4_v1EN
TPL-007-4 Transmission System Planned Performance for Geomagnetic Disturbance Events December 13, 2023
QRSAW VAR-001-4.2 v2EN
VAR-001-4.2 Voltage and Reactive Control July 27, 2022
QRSAW_VAR-002-4.1_v2EN
VAR-002-4.1 Generator Operation for Maintaining Network Voltage Schedules
July 27, 2022
Notes :
1 – Northeast Power Coordinating Council (NPCC) is responsible of the development of the Québec Reliability Standard Audit Worksheets, «QRSAW» and the Régie de l’énergie (the Régie), for publishing them. You may send all your comments and suggestions to the Régie which will either address them or transfer them to NPCC. Please, use the following email address: secretariat-PSCAQ@regie-energie.qc.ca
2 - If a link is broken, please inform the Documentation centre of the Régie.