Québec Reliability Standard Audit Worksheets (QRSAW) (1)


DocumentStandard NumberStandard TitleEffective Date of the form

QRSAW BAL-001-2 v2EN

BAL-001-2Real Power Balancing Control Performance

February 9, 2022

QRSAW_BAL-002-3_v2EN
BAL-002-3Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency EventFebruary 9, 2022
QRSAW_BAL-003-2_v1EN
BAL-003-2Frequency Response and Frequency Bias SettingDecember 1, 2021
QRSAW_BAL-005-1_v2EN
BAL-005-1Balancing Authority ControlFebruary 9, 2022
QRSAW_CIP-002-5.1a_v3EN
CIP-002-5.1aCyber Security – BES Cyber System CategorizationFebruary 9, 2022
QRSAW_CIP-003-8_v2EN
CIP-003-8Cyber Security – Security Management ControlsFebruary 9, 2022
QRSAW_CIP-004-7_v1EN
CIP-004-7Cyber Security – Personnel & TrainingJanuary 15, 2025
QRSAW_CIP-005-7_v1EN
CIP-005-7Cyber Security – Electronic Security Perimeter(s)November 15, 2023
QRSAW_CIP-006-6_v2EN
CIP-006-6Cyber Security – Physical Security of BES Cyber SystemsFebruary 9, 2022
QRSAW_CIP-007-6_v2EN
CIP-007-6Cyber Security – System Security ManagementFebruary 9, 2022
QRSAW_CIP-008-6_v1EN
CIP-008-6Cyber Security – Incident Reporting and Response PlanningOctober 6, 2022
QRSAW_CIP-009-6_v2EN
CIP-009-6Cyber Security – Recovery Plans for BES Cyber SystemsFebruary 9, 2022
QRSAW_CIP-010-4_v1EN
CIP-010-4Cyber Security – Configuration Change Management and Vulnerability AssessmentsDecember 13, 2023
QRSAW_CIP-011-3_v1EN
CIP-011-3Cyber Security – Information ProtectionFebruary 20, 2025
QRSAW_CIP-012-1_v1EN
CIP-012-1
Cyber Security – Communications between Control Centers
June 26, 2024
QRSAW_CIP-013-2_v1EN
CIP-013-2
Cyber Security – Supply Chain Risk ManagementDecember 13, 2023
QRSAW_CIP-014-3_v1EN
CIP-014-3Physical Security
September 27, 2023
QRSAW_COM-001-3_v2EN
COM-001-3CommunicationsJune 15, 2022
QRSAW_COM-002-4_V2EN
COM-002-4Operating Personnel Communications ProtocolsJune 15, 2022
QRSAW_EOP-004-4_v2EN
EOP-004-4Event ReportingJune 15, 2022
QRSAW_EOP-005-3_v2EN
EOP-005-3System Restoration from Blackstart ResourcesJune 15, 2022
QRSAW_EOP-006-3_v2EN
EOP-006-3System Restoration CoordinationJune 15, 2022
QRSAW_EOP-008-2_v2EN
EOP-008-2Loss of Control Center FunctionalityJune 15, 2022
QRSAW_EOP-010-1_v3EN
EOP-010-1Geomagnetic Disturbance OperationsJune 15, 2022
QRSAW_EOP-011-2_v1EN
EOP-011-2Emergency Preparedness and OperationsNovember 27, 2024
QRSAW_FAC-001-4_v1EN
FAC-001-4Facility Interconnection RequirementsOctober 23, 2024
QRSAW_FAC-002-4_v1EN
FAC-002-4Facility Interconnection StudiesOctober 23, 2024
QRSAW_FAC-003-4_v2EN
FAC-003-4Transmission Vegetation ManagementJune 15, 2022
QRSAW_FAC-008-5_v1EN
FAC-008-5Facility RatingsMay 11, 2022
QRSAW_FAC-011-3 v1EN
FAC-011-3System Operating Limits Methodology for the Operations HorizonOctober 1, 2021
QRSAW_FAC-014-2_v2EN
FAC-014-2Establish and Communicate System Operating LimitsJune 15, 2022
QRSAW INT-006-5 v1EN
INT-006-5Evaluation of Interchange TransactionsOctober 1, 2021
QRSAW INT-009-3 v1EN
INT-009-3Implementation of InterchangeOctober 1, 2021
QRSAW IRO-001-4 v2EN
IRO-001-4Reliability Coordination – ResponsibilitiesJuly 27, 2022
QRSAW_IRO-002-7_v1EN
IRO-002-7Reliability Coordination – Monitoring and AnalysisMay 11, 2022
QRSAW IRO-006-5 v2EN
IRO-006-5Reliability Coordination – Transmission Loading Relief (TLR)July 27, 2022
QRSAW IRO-008-2 v2EN
IRO-008-2Reliability Coordinator Operational Analyses and Real-time AssessmentsJuly 27, 2022
QRSAW IRO-009-2 v2EN
IRO-009-2Reliability Coordinator Actions to Operate Within IROLsJuly 27, 2022
QRSAW IRO-010-4 v1EN
IRO-010-4Reliability Coordinator Data Specification and CollectionNovember 27, 2024
QRSAW IRO-014-3 v2EN
IRO-014-3Coordination Among Reliability CoordinatorsJuly 27, 2022
QRSAW IRO-017-1 v2EN
IRO-017-1Outage coordinationJuly 27, 2022
QRSAW_IRO-018-1(i)_v1EN
IRO-018-1(i)Reliability Coordinator Real-time Reliability Monitoring and Analysis CapabilitiesFebruary 9, 2022
QRSAW MOD-025-2 v2EN
MOD-025-2Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power CapabilityJuly 27, 2022
QRSAW MOD-026-1 v2EN
MOD-026-1Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control FunctionsJuly 27, 2022
QRSAW MOD-027-1 v2EN
MOD-027-1Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control FunctionsJuly 27, 2022
QRSAW_MOD-031-3_v1EN
MOD-031-3Demand and Energy DataOctober 6, 2022
QRSAW MOD-032-1 v2EN
MOD-032-1Data for Power System Modeling and AnalysisJuly 27, 2022
QRSAW_MOD-033-2_v1EN
MOD-033-2Steady-State and Dynamic System Model ValidationOctober 6, 2022
QRSAW_PER-003-2_v1EN
PER-003-2Operating Personnel Credentials StandardFebruary 9, 2022
QRSAW PER-005-2 v2EN
PER-005-2Operations Personnel TrainingJuly 27, 2022
QRSAW PER-006-1 v1EN
PER-006-1
Specific Training for PersonnelSeptember 27, 2023
QRSAW_PRC-002-2_v2EN
PRC-002-2Disturbance Monitoring and Reporting RequirementsSeptember 7, 2022
QRSAW PRC-004-6 v1EN
PRC-004-6Protection System Misoperation Identification and CorrectionOctober 1, 2021
QRSAW_PRC-005-6_v2EN
PRC-005-6Protection System, Automatic Reclosing, and Sudden Pressure Relaying MaintenanceSeptember 7, 2022
QRSAW_PRC-006-5_v1EN
PRC-006-5Automatic Underfrequency Load SheddingJanuary 11, 2023
QRSAW_PRC-006-NPCC-2_v2EN
PRC-006-NPCC-2Automatic Underfrequency Load SheddingSeptember 7, 2022
QRSAW_PRC-010-2_v2EN
PRC-010-2Undervoltage Load SheddingSeptember 7, 2022
QRSAW_PRC-012-2_v2EN
PRC-012-2Remedial Action SchemesSeptember 7, 2022
QRSAW_PRC-019-2_v2EN
PRC-019-2Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and ProtectionSeptember 7, 2022
QRSAW_PRC-023-4_v2EN
PRC-023-4Transmission Relay LoadabilitySeptember 7, 2022
QRSAW_PRC-024-3_v1EN
PRC-024-3Frequency and Voltage Protection Settings for Generating Resources
July 3, 2025
QRSAW_PRC-025-2_v1EN
PRC-025-2Generator Relay LoadabilityJanuary 11, 2023
QRSAW_PRC-026-1_v3EN
PRC-026-1Relay Performance During Stable Power SwingsSeptember 7, 2022
QRSAW_PRC-027-1_v1EN
PRC-027-1
Coordination of Protection Systems for Performance During Faults
September 18, 2024
QRSAW_TOP-001-5_v1EN
TOP-001-5
Transmission OperationsDecember 13, 2023
QRSAW_TOP-002-4_v2EN
TOP-002-4Operations PlanningSeptember 7, 2022
QRSAW_TOP-003-5_v1EN
TOP-003-5Operational Reliability Data
November 27, 2024
QRSAW_TOP-010-1(i)_v1EN
TOP-010-1(i)Real-time Reliability Monitoring and Analysis CapabilitiesFebruary 9, 2022
QRSAW_TPL-001-4_v2EN
TPL-001-4Transmission System Planning Performance RequirementsSeptember 7, 2022
QRSAW_TPL-007-4_v1EN
TPL-007-4Transmission System Planned Performance for Geomagnetic Disturbance EventsDecember 13, 2023
QRSAW VAR-001-4.2 v2EN
VAR-001-4.2Voltage and Reactive ControlJuly 27, 2022
QRSAW_VAR-002-4.1_v2EN
VAR-002-4.1Generator Operation for Maintaining Network Voltage Schedules
July 27, 2022
Notes :
1 – Northeast Power Coordinating Council (NPCC) is responsible of the development of the Québec Reliability Standard Audit Worksheets, «QRSAW» and the Régie de l’énergie (the Régie), for publishing them. You may send all your comments and suggestions to the Régie which will either address them or transfer them to NPCC. Please, use the following email address: secretariat-PSCAQ@regie-energie.qc.ca.