Number*Standard TitleInitial Enforcement Date / DecisionInactive Date / DecisionNotes
BAL-001-0.1aReal Power Balancing Control PerformanceApril 1, 2015
D-2014-216
April 1, 2017
D-2017-012
 
BAL-002-1Disturbance Control Performance

April 1, 2015
D-2014-216

April 1, 2021
D-2020-067

 
BAL-003-1.1Frequency Response and Frequency Bias Setting

April 1, 2017
D-2017-012

December 1, 2021
D-2021-126

 
BAL-004-0Time Error CorrectionJanuary 1, 2016
D-2015-168
November 5, 2019
D-2019-139
 
BAL-005-0.2bAutomatic Generation ControlJanuary 1, 2016
D-2015-168
January 1, 2017
D-2016-195
 
BAL-005-0.2bAutomatic Generation Control

January 1, 2017
D-2016-195

July 1, 2021
D-2020-067

 
BAL-006-2Inadvertent InterchangeApril 1, 2015
D-2014-216
January 1, 2019
D-2018-179
In its decision D-2018-179, the Régie suspends the Enforcement of Requirements 1, 2, 4 and 5 as of January 1, 2019.
BAL-006-2Inadvertent Interchange

April 1, 2015
D-2014-216
D-2018-179

July 1, 2021
D-2020-067
 
CIP-002-5.1Cyber Security - BES cyber System CategorizationJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031

April 1, 2019
D-2019-033

 
CIP-003-5Cyber Security — Security Management ControlsJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
D-2017-069
January 1, 2018
D-2017-117
 
CIP-003-6Cyber Security – Security Management Controls

January 1, 2018
D-2017-117




August 10, 2018
D-2018-107


January 1, 2020
D-2019-033

From January 1, 2018 to August 10, 2018, the sections 2 and 3 of attachment 1 of the CIP-003-6 standard for low impact BES Cyber Systems were implemented at different dates.

In decision
D-2018-107 the Régie suspends the implementation dates of sections 2 and 3 of attachment 1 of the CIP-003-6 standard for low impact BES Cyber Systems.

In decision
D-2019-033, the Régie set to January 1, 2020 the withdrawal date for standard
CIP-003-6 as well as its Quebec Appendix.
CIP-003-7Cyber Security — Security Management ControlsJanuary 1, 2020
D-2019-033
October 1, 2021
D-2020-118
 
CIP-004-5.1Cyber Security — Personnel & Training

January 1, 2017
D-2016-119
D-2016-138
D-2017-031

January 1, 2018
D-2017-117

 
CIP-004-6Cyber Security — Personnel & TrainingJanuary 1, 2018
D-2017-117
January 1, 2025
D-2022-150

CIP-005-5Cyber Security — Electronic Security Perimeter(s)

January 1, 2017
D-2016-119
D-2016-138
D-2017-031

October 1, 2022
D-2020-118

 
CIP-005-6Cyber Security — Electronic Security Perimeter(s)October 1, 2022
D-2020-118
October 1, 2023
D-2022-021

CIP-006-5Cyber Security — Physical Security of BES Cyber SystemsJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
January 1, 2018
D-2017-117
 
CIP-007-5Cyber Security — System Security ManagementJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
January 1, 2018
D-2017-117
 
CIP-008-5Cyber Security — Incident Reporting and Response Planning

January 1, 2017
D-2016-119
D-2016-138
D-2017-031

October 1, 2022
D-2020-118

 
CIP-009-5Cyber Security — Recovery Plans for BES Cyber SystemsJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
January 1, 2018
D-2017-117
 
CIP-010-1Cyber Security — Configuration Change Management and Vulnerability AssessmentsJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
January 1, 2018
D-2017-117
 
CIP-010-2Cyber Security — Configuration Change Management and Vulnerability Assessments

January 1, 2018
D-2017-117

October 1, 2022
D-2020-118

 
CIP-010-3Cyber Security — Configuration Change Management and Vulnerability AssessmentsOctober 1, 2022
D-2020-118
October 1, 2023
D-2022-021

CIP-011-1Cyber Security — Information ProtectionJanuary 1, 2017
D-2016-119
D-2016-138
D-2017-031
January 1, 2018
D-2017-117
 
CIP-011-2Cyber Security — Information ProtectionJanuary 1, 2018
D-2017-117
January 1, 2025
D-2022-150

CIP-013-1Cyber Security - Supply Chain Risk ManagementOctober 1, 2022
D-2020-118
October 1, 2023
D-2022-021

CIP-014-2Physical SecurityJuly 1, 2018
D-2017-117
April 1, 2023
D-2022-133
 
COM-001-1.1TelecommunicationsApril 1, 2015
D-2014-216
April 1, 2017
D-2016-195
From April 1, 2015 to April 1, 2017 all requirements of COM-001-1.1 standard were in effect.
COM-001-1.1TelecommunicationsApril 1, 2017
D-2016-195

January 1, 2018
D-2016-195

From April 1, 2017 to January 1, 2018 only requirement R4 of COM-001-1.1 standard was in effect.
COM-001-2.1Communications

April 1, 2017
D-2016-195

April 1, 2021
D-2020-067

 
COM-002-2Communication and coordinationJanuary 1, 2016
D-2015-168
January 1, 2018
D-2016-195
 
EOP-001-2.1bEmergency Operations PlanningApril 1, 2015
D-2014-216
April 2, 2017
D-2017-015
 
EOP-002-3.1Capacity and Energy EmergenciesJanuary 1, 2016
D-2015-168
April 2, 2017
D-2017-015
 
EOP-003-2Load Shedding PlansJanuary 1, 2017
D-2016-150
April 2, 2017
D-2017-015
 
EOP-004-2Event Reporting

January 1, 2018
D-2017-110

January 1, 2021
D-2020-131

 
EOP-005-2System Restoration from Blackstart Resources

April 1, 2016
D-2016-034

January 1, 2021
D-2019-158

 
EOP-006-2System Restoration Coordination

April 1, 2016
D-2015-198

January 1, 2021
D-2019-158

 
EOP-008-1Loss of Control Center Functionality

April 1, 2016
D-2015-198

January 1, 2021
D-2019-158

 
EOP-011-1Emergency Operations

April 2, 2017
D-2017-015

October 1, 2024
D-2023-040


FAC-001-2Facility Interconnection Requirements

January 1, 2018
D-2016-195

July 1, 2021
D-2020-067

 
FAC-001-3Facility Interconnection Requirements

July 1, 2021
D-2020-067

April 1, 2022
D-2021-145

Editorial changes.
FAC-001-3Facility Interconnection Requirements

April 1, 2022
D-2021-145

October 1, 2024
D-2023-107


FAC-002-2Facility Interconnection Studies

January 1, 2018
D-2016-195

October 1, 2022
D-2022-085

 
FAC-002-3Facility Interconnection Studies

October 1, 2022
D-2022-085

October 1, 2024
D-2023-107


FAC-003-3Transmission Vegetation Management

R3 – July 1, 2017
R1, R2, R4 to R7 – January 1, 2018
D-2016-195

April 1, 2021
D-2020-067
 
FAC-008-3Facility Ratings

July 1, 2017
D-2016-195

April 1, 2022
D-2021-145

 
FAC-010-2.1System Operating Limits Methodology for the Planning Horizon

January 1, 2016
D-2015-168
D-2017-127

April 1, 2019
D-2019-032

 
FAC-010-2.1System Operating Limits Methodology for the Planning HorizonApril 1, 2019
D-2018-101
D-2019-032
D-2019-162
D-2020-156
October 1, 2021
D-2021-078
 
FAC-011-2System Operating Limits Methodology for the Operations Horizon

January 1, 2016
D-2015-168
D-2017-127

April 1, 2019
D-2019-032

 
FAC-011-2System Operating Limits Methodology for the Operations HorizonApril 1, 2019
D-2018-101
D-2019-032
D-2019-162
D-2020-156
October 1, 2021
D-2021-078
 
INT-004-3Dynamic Transfers

October 1, 2017
D-2017-110

April 1, 2018
D-2018-017

 
INT-004-3.1Dynamic Transfers

April 1, 2018
D-2018-017

July 1, 2021
D-2021-058

 
INT-006-4Evaluation of Interchange TransactionsApril 1, 2017
D-2017-012
October 1, 2021
D-2021-058
 
INT-009-2Implementation of Interchange

April 1, 2017
D-2017-012

April 1, 2018
D-2018-017
 
INT-009-2.1Implementation of InterchangeApril 1, 2018
D-2018-017
October 1, 2021
D-2021-058
 
INT-010-2Interchange Initiation and Modification for ReliabilityApril 1, 2017
D-2017-012
April 1, 2018
D-2018-017
 
INT-010-2.1Interchange Initiation and Modification for ReliabilityApril 1, 2018
D-2018-017
July 1, 2021
D-2021-058
 
IRO-001-1.1Reliability Coordination - Responsabilities and AuthoritiesApril 1, 2016
D-2016-011
July 1, 2017
D-2017-061
 
IRO-002-2Reliability Coordination – FacilitiesJanuary 1, 2016
D-2015-168
July 1, 2017
D-2017-061
 
IRO-002-4Reliability Coordination – Monitoring and Analysis

April 1, 2022
D-2021-047

April 1, 2022
D-2022-031

The standard IRO-002-4 and its Québec Appendix, in their French and English versions, as adopted per decision D-2021-047, have never come into force.
IRO-002-4Reliability Coordination - Monitoring and Analysis

July 1, 2017
D-2017-061

August 1, 2022
D-2021-047

 
IRO-003-2Reliability Coordination – Wide-Area ViewJanuary 1, 2016
D-2015-168
July 1, 2017
D-2017-061
 
IRO-004-2Reliability Coordination – Operations PlanningJanuary 1, 2016
D-2015-168
July 1, 2017
D-2017-061
 
IRO-005-3.1aReliability Coordination - Current Day OperationsApril 1, 2016
D-2016-034
July 1, 2017 - R1 to R10 & R12
D-2017-061
Except requirement R11, all other requirements of this standard are withdrawn on July 1, 2017.
IRO-005-3.1aReliability Coordination - Current Day OperationsApril 1, 2016
D-2016-034

July 1, 2024 – R11
D-2024-063

The last in effect requirement of this standard is withdrawn on July 1, 2024.
IRO-008-1Reliability Coordinator Operational Analyses and Real-time Assessments

January 1, 2017
D-2016-150
July 1, 2017
D-2017-061
 
IRO-009-1Reliability Coordinator Actions to Operate Within IROLs

January 1, 2017
D-2016-150
July 1, 2017
D-2017-061
 
IRO-010-1aReliability Coordinator Data Specification and Collection

January 1, 2017
D-2016-150
July 1, 2017
D-2017-061
 
IRO-010-2Reliability Coordinator Data Specification and Collection

July 1, 2017
D-2017-061

August 1, 2022
D-2021-047

 
IRO-010-2Reliability Coordinator Data Specification and Collection

April 1, 2022
D-2021-047
D-2022-094
D-2022-094R

October 1, 2022
D-2022-085

 
IRO-010-3Reliability Coordinator Data Specification and Collection

October 1, 2022
D-2022-085

October 1, 2024
D-2023-040


IRO-014-1Procedures, Processes, or Plans to Support Coordination Between Reliability CoordinatorsApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
IRO-015-1Notifications and Information Exchange Between Reliability CoordinatorsApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
IRO-016-1Coordination of Real-time Activities Between Reliability CoordinatorsApril 1, 2015
D-2014-216
January 1, 2017
D-2016-150
From April 1, 2015 to January 1, 2017 all requirements of IRO-016-1 standard were in effect.
IRO-016-1Coordination of Real-time Activities Between Reliability CoordinatorsJanuary 1, 2017
D-2016-150
July 1, 2017
D-2017-061
From January 1, 2017 to July 1, 2017 only requirement R1 of IRO-016-1 standard was in effect.
MOD-016-1.1Documentation of Data Reporting Requirements for Actual and Forecast Demands, Net Energy for Load, and Controllable Demand-Side Management

January 1, 2016
D-2015-168

April 1, 2020
D-2019-178

 
MOD-017-0.1Aggregated Actual and Forecast Demands and Net Energy for Load

July 1, 2016
D-2016-066

April 1, 2020
D-2019-178
 
MOD-018-0Treatment of Nonmember Demand Data and How Uncertainties are Addressed in the Forecasts of Demand and Net Energy for LoadJuly 1, 2016
D-2016-066
April 1, 2020
D-2019-178
 
MOD-019-0.1Reporting of Interruptible Demands and Direct Control Load ManagementJuly 1, 2016
D-2016-066
April 1, 2020
D-2019-178
 
MOD-020-0Providing Interruptible Demands and Direct Control Load Management Data to System Operators and Reliability Coordinators

January 1, 2016
D-2015-168

July 1, 2021
D-2021-058
 
MOD-021-1Documentation of the Accounting Methodology for the Effects of Demand Side Management in Demand and Energy ForecastsJuly 1, 2016
D-2016-066
April 1, 2020
D-2019-178
 
MOD-031-2Demand and Energy Data

April 1, 2020 for functions other than DP
July 1, 2020 for DP function only
D-2019-178

October 1, 2022
D-2022-085

 
MOD-033-1Steady-State and Dynamic System Model Validation

January 1, 2019
D-2016-195

October 1, 2022
D-2022-085

 
PER-001-0.2Operating Personnel Responsibility and AuthorityApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
PER-003-1Operating Personnel Credentials Standard

April 1, 2016
D-2015-198

July 1, 2021
D-2021-070

 
PER-004-2Reliability Coordination — Staffing

April 1, 2017
D-2017-012

January 1, 2022
D-2021-070
D-2021-070R

 
PRC-001-1System Protection Coordination

January 1, 2016
D-2015-168

January 1, 2021
D-2020-131

 
PRC-001-1.1(ii)System Protection CoordinationJanuary 1, 2021
D-2020-131
July 1, 2023
D-2021-070
D-2021-070R
Withdrawal of requirements R1, R2, R5 and R6.
PRC-001-1.1(ii)System Protection Coordination

July 1, 2023
D-2021-070
D-2021-070R

October 1, 2024
D-2022-108

Withdrawal of requirements R3 and R4
PRC-004-5(i)Protection System Misoperation Identification and Correction

April 2, 2017
D-2017-015

April 1, 2021
D-2020-167
Consult the Quebec Appendix of the standard.
PRC-004-5(i)Protection System Misoperation Identification and CorrectionApril 1, 2021
D-2020-167
October 1, 2021
D-2021-058
 
PRC-005-2Protection System Maintenance

January 1, 2017
D-2016-150

April 1, 2021
D-2020-167

 
PRC-006-3Automatic Underfrequency Load Shedding

October 1, 2018
D-2018-098

October 1, 2022
D-2022-085

 
PRC-019-1Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection

January 1, 2017
D-2016-150
D-2020-128

January 1, 2021
D-2020-131

 
PRC-021-1Under-Voltage Load Shedding Program DataJuly 1, 2016
D-2016-066
April 2, 2017
D-2017-015
 
PRC-023-3Transmission Relay Loadability

January 1, 2018
D-2017-110

January 1, 2021
D-2020-131
 
PRC-024-1Generator Frequency and Voltage Protective Relay SettingsD-2018-118April 1, 2021
D-2020-167
Since the review process is still ongoing, although adjourned (see letter of October 30, 2018 – only available in French), this standard remains in effect until April 1, 2021, or until a final decision is rendered in file R-4015-2017. The text of the standard is available here.
PRC-024-2Generator Frequency and Voltage Protective Relay SettingsApril 1, 2021
D-2020-167
July 1, 2025
D-2021-168

PRC-025-1Generator Relay Loadability

October 1, 2017
D-2017-110

October 1, 2022
D-2022-108

 
TOP-001-1aReliability Responsibilities and AuthoritiesJanuary 1, 2016
D-2015-168
July 1, 2017
D-2017-061
 
TOP-001-3Transmission Operations

July 1, 2017
D-2017-061

August 1, 2022
D-2021-047

 
TOP-001-3
Transmission Operations
April 1, 2022
D-2021-047
July 1, 2023
D-2022-031
The enforcement date of the standard TOP-001-3, as adopted per decision D-2021-047, was August 1, 2022.
TOP-002-2.1bNormal Operations PlanningJuly 1, 2016
D-2016-059
July 1, 2017 - R1 to R11 & R13 to R19
D-2017-061
Except requirement R12, all other requirements of this standard are withdrawn on July 1, 2017.
TOP-002-2.1bNormal Operations PlanningJuly 1, 2016
D-2016-059

July 1, 2024 – R12
D-2024-063

The last in effect requirement of this standard is withdrawn on July 1, 2024.
TOP-003-1Planned Outage CoordinationJanuary 1, 2016
D-2015-168
July 1, 2017
D-2017-061
 
TOP-003-3Operational Reliability Data

July 1, 2017
D-2017-061

August 1, 2022
D-2021-047

 
TOP-003-3Operational Reliability Data

April 1, 2022
D-2021-047
D-2022-094
D-2022-094R

October 1, 2022
D-2022-085

 
TOP-003-4Operational Reliability Data

October 1, 2022
D-2022-085

October 1, 2024
D-2023-040


TOP-004-2Transmission OperationsApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
TOP-005-2aOperational Reliability InformationApril 1, 2016
D-2016-011
July 1, 2017
D-2017-061
 
TOP-006-2Monitoring System ConditionsJuly 1, 2016
D-2016-059
July 1, 2017
D-2017-061
 
TOP-007-0Reporting System Operating Limit (SOL) and Interconnection Reliability Operating Limit (IROL) ViolationsApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
TOP-008-1Response to Transmission Limit ViolationApril 1, 2015
D-2014-216
July 1, 2017
D-2017-061
 
TPL-007-3Transmission System Planned Performance for Geomagnetic Disturbance EventsApril 1, 2021
D-2021-015
April 1, 2023
D-2022-110
 
VAR-001-4.1Voltage and Reactive ControlJanuary 1, 2017
D-2016-150
April 1, 2018
D-2018-017
 
VAR-002-3Generator Operation for Maintaining Network Voltage Schedules

January 1, 2017
D-2016-150

January 1, 2021
D-2020-131
 